powered pallet truck: also known as electric pallet truck, electric ground beef, electric pallet truck, suitable for heavy and long transhipment cargo handling efficiency can be greatly improved. Ultra-thin body design, CVT, especially small turning radius, body strong, light and flexible operation, no noise, no pollution.
2014年3月3日星期一
the liftstar powered pallet truck connection should be no loose
Crawler is short for crawler cranes , off site is a crawler , crawler cranes by . Lifting capacity, can hoist walk. With strong lifting capacity. Disassembly trouble, suitable large factories, working in the factory .
1 , various safety devices and various indicating instruments should be complete and reliable.
2 , wire rope and joints should be specified.
3 , fuel , lubricating oil , cooling water, oil, liquid , and should be sufficient .
4, the connection should be no loose.
5 , the crane must have stereo speakers or clear tones and other signals .
6 , before the crane work , you should note that the crane boom slewing range should be free of obstructions .
7 , when the heavy lifting, the feet should be placed on the driver's brake pedal , and close attention to lifting liftstar hand pallet trucks objects , rendering lifting objects reached its peak.
8 , hanging objects while driving should pay attention to the ground level and a solid case against skew dumping.
9 , when walking with load , the load should not exceed 70% by weight allowed from walking the road should be a solid formation, the boom should be in front of the track , heavy liftstar hand pallet jacks from the ground shall not exceed 0.5m, and should leash rope . Prohibited long-range load exercise .
10 , while working at the pit side of the fuselage and the pit should maintain the necessary distance based on soil conditions , to prevent landslides.
11 , after obtaining a driver lifting signal emitted by the signalman must be returned to its port after lifting .
12 , when lifting heavy objects , hook wire rope should remain vertical . Hanging from the first floor 200-500mm, check to make sure the crane stability , reliability and lashing rear brake firmly , in order to continue lifting.
13 , after the crane work , turn off the engine , put the lever in neutral position , each brake brake die, operating room closed lock .
14 , all maintenance , repair and adjustment and lubrication work must be carried out when the engine is stopped .